What is a solar charge controller?
It sits between your solar panels and battery, controlling the charge so the battery is filled fast without being overcharged, and disconnecting loads before it is over-discharged. No controller = dead batteries within weeks.
MPPT or PWM — which should I buy?
MPPT tracks the panel's maximum power point and yields up to 30% more energy than PWM, especially in cold or cloudy weather and with long cable runs. PWM wins on price for small, warm-climate street-light systems. Rule of thumb: under 20 A and budget-driven → PWM; anything larger or lithium → MPPT.
What size controller do I need?
Size it to the panel array's short-circuit current × 1.25 safety factor, and check the PV open-circuit voltage stays under the controller's Voc limit. Example: 6 × 450 W panels (Isc ≈ 11.6 A) in one string on a 24 V system → a 30 A controller is right. Send us your panel spec and we size it for free.
Do your controllers work with LiFePO4 batteries?
Yes — BTR, DBC, MPJ and MPK2 models have selectable lithium charge profiles. Tell us your battery and we preset the unit before shipping.
Which controller for solar street lights?
AT10 for the classic single-load lamp; SL for municipal tenders — dual output, 4 time-slots, half-power after midnight and dawn burst lighting, IP65 housing, IR remote.
What certifications do you have?
CE, RoHS, FCC on most series; MPK2 and HVP carry IEC 62109. Certificates are per series; ask for the PDF pack for the model you are sourcing.
Can I get my own logo and packaging?
Yes — OEM from 500 pcs, ODM (custom housing/firmware) from 1,000 pcs. Samples in about 2 weeks.
What are payment and delivery terms?
T/T, L/C at sight for large orders, trade-assurance through 1688 for first orders. Ex-works stock ships in 48 hours; production orders 15–20 days. FOB Shenzhen/Guangzhou or CIF your port.
Warranty and after-sales?
1–2 years standard, 3 years on HVP. 0.3–0.5% spare units shipped free with bulk orders; video-guided repair or replacement for confirmed defects.